Electricity: A 29 MW production gap on the RIA

Scheduled power cuts are once again necessary due to technical incidents. A production deficit of approximately 29 MW is currently disrupting electricity distribution in several localities within the Antananarivo Interconnected Network (RIA). According to Solofonantenaina Rakotonandraina, Director of the RIA, this situation is the result of two major incidents affecting production facilities. On one hand, a problem…

Captured & Published at: 2026-07-16 08:11:43 (Madagascar Local Time EAT)
Original Source: https://midi-madagasikara.mg/electricite-un-gap-de-production-de-29-mw-sur-le-ria/?utm_source=rss&utm_medium=rss&utm_campaign=electricite-un-gap-de-production-de-29-mw-sur-le-ria

Leave a Comment

Your email address will not be published. Required fields are marked *